The work crews are getting closer to our house as they excavate the street as a flood mitigation measure. Last year the road outside our house was raised so that flood water would by-pass our street and flow south. That work ended where the concrete sidewalk ends. The new work aims at lowering the section beyond that raised section so that flood waters could pond there and slowly drain away.
No comments:
Post a Comment