Wednesday, November 3, 2010

Progress on the bathroom renovations.

Three days into the bathroom renovation and real progress has taken place. The new cupboard and sink with the banjo top is on place.






A good start has been made in installing the tiles in the shower area.







The floor tiles are almost finished.








And with the pressure balanced shower fixtures I need no longer fear being scalded or frozen in the shower as the washing machine or the dish washer begins to operate.

No comments:

Post a Comment