Three days into the bathroom renovation and real progress has taken place. The new cupboard and sink with the banjo top is on place.
A good start has been made in installing the tiles in the shower area.
The floor tiles are almost finished.
And with the pressure balanced shower fixtures I need no longer fear being scalded or frozen in the shower as the washing machine or the dish washer begins to operate.
No comments:
Post a Comment